Volume Two 4. Coastal Environment Zone 4.3.6. Commercial forestry replanting. 4.3.6.1. Replanting must not be in, or within: (a) 8 metres of a river (except an ephemeral river) or lake; (b) 8m of a Significant Wetland; (c) 30 metres of the coastal marine area. 4.3.6.2. Replanting must not be within such proximity to any abstraction point for a drinking water supply registered under section 69J of the Health Act 1956 as to cause contamination of that water supply. 4.3.7. Woodlot forestry planting. 4.3.7.1. The following species must not be planted: (a) Douglas fir (Pseudotsuga menziesii ); (b) Lodgepole pine (Pinus contorta ); (c) Muricata pine (Pinus muricata ); (d) European larch (Larix decidua ); (e) Scots pine (Pinus sylvestris ); (f) Mountain or dwarf pine (Pinus mugo ); (g) Corsican pine (Pinus nigra ). 4.3.7.2. Planting must not be in, or within: (a) 30m of a formed and sealed public road; (b) 8m of a river (except an ephemeral river) or lake; (c) 8m of a Significant Wetland; (d) 200m of the coastal marine area; (e) Steep Erosion-Prone Land, unless replanting harvested woodlot forest lawfully established. 4.3.7.3. Planting must not be within such proximity to any abstraction point for a drinking water supply registered under section 69J of the Health Act 1956 as to cause contamination of that water supply. 4.3.8. Woodlot forestry harvesting. 4.3.8.1. Harvesting must not be in, or within: (a) 8m of a river (except an ephemeral river when not flowing) or lake, except where the trees being harvested were lawfully established prior to 9 June 2016 (this exception does not apply to excavation); (b) 8m of a Significant Wetland; (c) 200m of the coastal marine area. 4.3.8.2. Harvesting must not be within such proximity to any abstraction point for a drinking water supply registered under section 69J of the Health Act 1956 as to cause contamination of that water supply. 4.3.8.3. No excavation or filling in excess of 1000m must occur on any land with a 3 slope greater than 20° within any 24 month period. 4.3.8.4. No excavation must occur on any land with a slope greater than 35°. 4 – 9