Volume Two 5. Urban Residential 1 & 2 Zone (f) High Street between the intersection with Henry Street and the intersection of Beaver Road. (g) Henry Street between the intersection with High Street and the intersection of Maxwell Road. (h) Henry Street between the intersection with Alfred Street and the intersection of John Street. (i) Maxwell Road between the intersection with Seymour Street and the intersection of Graham Street. (j) Main Street between the intersection with Symons Street and the intersection of Market Street. (k) Seymour Street between the intersection with Maxwell Road and the intersection of Francis Street. (l) Dodson Street between the intersection with Grove Road and the intersection of Warwick Street. (m) Budge Street between the intersection with Grove Road and the intersection of Shirtliff Street. (n) Redwood Street between the intersection with Stephenson Street and the intersection of McCartney Street. (o) Main Street between the intersection with Lybster Street and the intersection of Dunbeath Street. Picton (a) Wairau Road between the intersection with Durham Street and the intersection of Auckland Street. (b) Kent Street between the intersection with Wairau Road and the intersection of Lagoon Road. (c) Auckland Street. (d) High Street. (e) Wellington Street. (f) Waikawa Road between the intersection with Rutland Street and the intersection of Sussex Street. Renwick (a) High Street. 5.3.7. Relocated building. 5.3.7.1. A building intended for use as a dwelling must have previously been designed, built and used as a dwelling. 5.3.7.2. All work required to reinstate the exterior must be completed within 6 months of the building being delivered to the site. This includes providing connections to all infrastructure services and closing in and ventilation of the foundations. The owner of the land on which the building is to be located must certify to the Council, before the building is relocated, that the reinstatement work will be completed within the 6 month period. 5.3.7.3. The siting of the relocated building must also comply with Standard 5.2.1.6. 5.3.8. Temporary building or structure, or unmodified shipping container. 5.3.8.1. For a temporary building or structure, or an unmodified shipping container, ancillary to a building or construction project the building, structure or container must not: 5 – 7