6. Urban Residential 3 Zone Volume Two 6.2.6. Dust. 6.2.6.1. The best practicable method must be adopted to avoid dust beyond the legal boundary of the area of land on which the activity is occurring. 6.2.7. Dust from any process vent or stack. 6.2.7.1. The dust must not contain hazardous substances. 6.2.7.2. The particulate discharge rate from any air pollution control equipment and dust collection system must not exceed 250mg/m at any time, corrected to 0°C, 1 3 atmosphere pressure, dry gas basis. 6.2.7.3. Dust particles must not exceed 0.05mm size in any direction. 6.3. Standards that apply to specific permitted activities 6.3.1. Home occupation. 6.3.1.1. The home occupation must be undertaken by a person(s) residing on the site and employ/contract no more than 1 additional person. 6.3.1.2. For home occupation activities that generate traffic, hours of operation must only occur during the following hours: 8.00 am to 6.00 pm Monday to Friday 9.00 am to 12.00 pm Saturday 6.3.1.3. The home occupation must be carried out wholly within the dwelling or within an accessory building. 6.3.1.4. Only goods produced, repaired, renovated or restored on the site may be retailed from the site. 6.3.2. Relocated building. 6.3.2.1. A building intended for use as a dwelling must have previously been designed, built and used as a dwelling. 6.3.2.2. All work required to reinstate the exterior must be completed within 6 months of the building being delivered to the site. This includes providing connections to all infrastructure services and closing in and ventilation of the foundations. The owner of the land on which the building is to be relocated must certify to the Council, before the building is relocated, that the reinstatement work will be completed within the 6 month period. 6.3.2.3. The siting of the relocated building must also comply with Standard 6.2.1.4. 6.3.1. Temporary building or structure, or unmodified shipping container. 6.3.1.1. For a temporary building or structure, or an unmodified shipping container, ancillary to a building or construction project the building, structure or container must not: (a) exceed 40m in area; 2 (b) remain on the site for longer than the duration of the project or 12 months, whichever is the lesser. 6.3.1.2. A temporary building or structure, or an unmodified shipping container, on site for a purpose other than those specified in Standard 6.3.1.1 (such as 6 – 4