13. Port Zone Volume Two 13.4.3.7. Controls on sedimentation during disturbance. 13.4.3.8. Restrictions on public access during the operation. [D] 13.4.4. Processing facility for fish, shellfish or any other marine organism, including the processing and curing of marine harvest, minerals and premises for the wholesale and retail sale of harvested products. Matters over which the Council will exercise discretion: 13.4.4.1. Water supply. 13.4.4.2. Trade waste servicing. 13.4.4.3. Reverse sensitivity issues. [C] 13.4.5. Reclamation of the foreshore and seabed. Standards and terms: 13.4.5.1. The reclamation must be necessary for the operation of the port. 13.4.5.2. The reclamation must not exceed more than 1ha in area. Matters over which the Council will exercise discretion: 13.4.5.3. Benefits likely to arise from use of the reclamation. 13.4.5.4. The quantity and composition of material to be deposited within the coastal marine area. 13.4.5.5. Location of the reclamation. 13.4.5.6. Effects on the surrounding hydrodynamic and geomorphic environment. 13.4.5.7. Effects on the integrity of any terrestrial or marine ecosystems. 13.4.5.8. Effects resulting from any increased risk of natural hazards. 13.4.5.9. Restrictions on public access during the operation. [D] 13.4.6. Excavation in excess of 1000m on any land with a slope greater than 20° within 3 any 24 month period. Matters over which the Council will exercise discretion: 13.4.6.1. The effects on water quality and soil conservation from the excavation. 13.5. Discretionary Activities Application must be made for a Discretionary Activity for the following: [C, R, D] 13.5.1. Any activity provided for as a Permitted Activity or Restricted Discretionary Activity that does not meet the applicable standards. 13 – 18