14. Port Landing Area Zone Volume Two [R, D] 14.1.13. Excavation. [R, D] 14.1.14. Filling of land with clean fill. [R, D] 14.1.15. Non-indigenous vegetation clearance. [C] 14.1.16. Marine oil spill clean-up activity and the associated release of oil dispersants. [C] 14.1.17. Take and use of coastal water. [C] 14.1.18. Occupation of the coastal marine area associated with any permitted activity except Coastal Recreation. 14.2. Standards that apply to all activities 14.2.1. Construction, use maintenance, repair, replacement or extension of a building or structure. 14.2.1.1. The maximum height of any light tower, crane, lifting device, mast elevator, machinery room, conveyor belt, linkspan or gangway, flagpole or antenna, must not exceed 15m. 14.2.1.2. Notwithstanding Standard 14.2.1.1, the maximum height of any structure (including a silo or tank) must not exceed 6m above natural ground level or the ground level established by reclamation. 14.2.1.3. The minimum setback of a building or structure to a public road must be 3m. 14.2.1.4. The minimum setback of a building or structure to the Coastal Living Zone must be 10m. 14.2.1.5. The minimum setback of a building or structure to the boundary of a Zone not specified in 14.2.1.4, except the Coastal Marine Zone, must be 5m. 14.2.1.6. The land within the minimum building setbacks must not be used for port operations (except motor vehicle parking), cargo loading, storage or a containment area. 14.2.1.7. A building or structure must not be sited within 20m of a Riparian Natural Character Management Area. 14.2.2. Disturbance of the foreshore or seabed. 14.2.2.1. Any adverse effects arising from disturbance of the foreshore or seabed must be able to be remedied by natural processes within 7 days of the disturbance. 14.2.2.2. The disturbance must be undertaken in a manner which minimises water turbidity. 14.2.2.3. The disturbance must not adversely affect navigational safety. 14 – 2