18. Open Space 2 Zone Volume Two 18.3.8.4. The application must be undertaken in accordance with the most recent product label. All spills of agrichemicals above the application rate must be notified to Council immediately. 18.3.8.5. The application must be carried out in accordance with Sections 5.3 and 5.5 of NZS 8409:2004 Safe Use of Agricultural Compounds and Plant Protection Products – Management of Agrichemicals. 18.3.9. Application of fertiliser or lime into or onto land. 18.3.9.1. Fertiliser must not be applied to a Soil Sensitive Area identified as free- draining soils. 18.3.9.2. Fertiliser must be stored on an impermeable, bunded surface and covered at all times. 18.3.9.3. The application must not result in the fertiliser being deposited in or on a river, lake, Significant Wetland, drainage channel or Drainage Channel Network that contains water. 18.3.9.4. The application must not occur when the soil moisture exceeds field capacity. 18.3.9.5. Total cumulative nitrogen (N) loading on the areal extent of land used for the application must not exceed 200 kg N/ha/year (excluding N from direct animal inputs). 18.3.9.6. All reasonable care must be exercised with the application so as to ensure that the fertiliser or lime must not pass beyond the legal boundary of the area of land on which the fertiliser or lime is being applied. 18.3.10. Discharge of human effluent into or onto land. 18.3.10.1. There must not be a Council operated sewerage system designed for that purpose within 30m of the Zone boundary or 60m of the closest building. 18.3.10.2. The human effluent must be treated via an on-site wastewater management system which must be maintained in an efficient operating condition at all times. 18.3.10.3. There must be no increase in the rate of discharge due to an increased occupancy of any building(s). 18.3.10.4. No objectionable odours must be able to be detected. 18.3.10.5. There must be: (a) no ponding of effluent; (b) no run-off or infiltration of effluent beyond the property boundary or into a river, lake, Significant Wetland, drainage channel, Drainage Channel Network, groundwater or coastal water. 18.3.10.6. The discharge rate must not exceed 2000 litres per day, averaged over any 7 day period. 18.3.10.7. Effluent must be able to: (a) infiltrate through at least 600 mm of unsaturated soil following primary treatment; or (b) infiltrate through at least 300 mm of unsaturated soil following secondary treatment. 18 – 6