Volume Two 19. Open Space 3 Zone 19.3.16.4. Application rates must not exceed those required by the Environmental Protection Authority or, if none, those stated on the most recent product label for the relevant application equipment or method and target species. 19.3.17. Application of fertiliser or lime into or onto land. 19.3.17.1. The application of fertiliser must not be applied to a Soil Sensitive Area identified as free-draining soils. 19.3.17.2. Fertiliser must be stored on an impermeable, bunded surface and covered at all times. 19.3.17.3. The application must not result in the fertiliser being deposited in or on a river, lake, Significant Wetland, drainage channel or Drainage Channel Network that contains water. 19.3.17.4. Total cumulative nitrogen (N) loading on the areal extent of land used for the application must not exceed 200 kg N/ha/year (excluding N from direct animal inputs). 19.3.17.5. The application must not occur when the soil moisture exceeds field capacity. 19.3.17.6. All reasonable care must be exercised with the application so as to ensure that the fertiliser or lime does not pass beyond the legal boundary of the area of land on which the fertiliser or lime is being applied. 19.3.18. Application of compost and solid agricultural waste into or onto land. 19.3.18.1. The application must not occur within: (a) 50m of a bore unless the bore intercepts the confined layer of Riverlands FMU or the confined layer of the Wairau Aquifer FMU; (b) 20m of a river, lake, Significant Wetland, drainage channel or Drainage Channel Network; (c) 10m of a dwelling on any adjacent land in different ownership. 19.3.18.2. The total cumulative nitrogen (N) loading from all discharges on the areal extent of land used for the application must not exceed 200 kg N/ha/year (excluding N from direct animal inputs). 19.3.19. Discharge of agricultural liquid waste (except dairy farm effluent) into or onto land. 19.3.19.1. The discharge must not occur into or onto a Soil Sensitive Area. 19.3.19.2. The discharge must not occur within: (a) 50m of a bore unless the bore intercepts the confined layer of Riverlands FMU or the confined layer of the Wairau Aquifer FMU; (b) 20m of a river, lake, Significant Wetland, drainage channel or Drainage Channel Network; (c) 10m of the boundary of any adjacent land in different ownership. 19.3.19.3. A high rate discharge system must not be used to discharge onto land with an average slope of 7° or greater, and the slope must not exceed 11.3° (1:5) at any point. 19.3.19.4. The discharge must not occur when the soil moisture exceeds field capacity. 19.3.19.5. Ponding must not be detectable beyond 24 hours after discharge. 19.3.19.6. The discharge must not result in anaerobic soil conditions. 19 – 11