Volume Two 22. Lake Grassmere Salt Works Zone 22. Lake Grassmere Salt Works Zone 22.1. Permitted Activities Unless expressly limited elsewhere by a rule in the Marlborough Environment Plan (the Plan), the following activities shall be permitted without resource consent where they comply with the applicable standards in 22.2 and 22.3: [R, D] 22.1.1. Solar production, refining, handling, packaging, storage and sale of salt and associated by-products. [R, D] 22.1.2. Bunds and roads existing at 9 June 2016. [C] 22.1.3. Take and use of coastal water and the maintenance of existing seawater intake pipelines within the Lake Grassmere Salt Works Intake and Pipeline Extension Corridor shown in Appendix 21. [C] 22.1.4. Discharge of stormwater from Lake Grassmere and surrounding catchments or diluted brine to the coastal marine area. [C, R, D] 22.1.5. Construction and use of a temporary stormwater flood outlet channel from Lake Grassmere to the coastal marine area, including any disturbance of the foreshore and seabed. [D] 22.1.6. Living accommodation facility for staff. [R, D] 22.1.7. Excavation. [R, D] 22.1.8. Filling of land with clean fill. [R, D] 22.1.9. Indigenous vegetation clearance. [R, D] 22.1.10. Non-indigenous vegetation clearance. [R] 22.1.11. Discharge of human effluent into or onto land. 22 – 1