24. Subdivision Volume Two Town Water Sewerage Stormwater Havelock Required Required Required Rai Valley Not required Not required Required Wairau Valley Required Not required Not required Township Grovetown Not required Required Required Spring Creek Not required Required Required Marlborough Required Required Required Ridge Seddon Required Required Required Ward Required Not required Required (b) Coastal Living at Rarangi in accordance with the table below: Town Water Sewerage Stormwater Rarangi Required Not required Not required (c) Industrial 2. (d) Business 1. [D] 24.1.2. The applicant must provide confirmation, together with the application for subdivision consent, that adequate provision has been made or adequate provision is practicable to be made for the required water, sewerage and stormwater reticulation. [D] 24.1.3. Acceptable confirmation as to the adequate provision of water, sewerage and stormwater must be a written statement from the Assets and Services Department of the Council or, where applicable, the person or organisation responsible for the reticulated service. Roading [D] 24.1.4. Where access is to be provided to a legal road, the applicant must provide roading, and access to that roading, for all allotments. The applicant must upgrade, or contribute to the upgrade of, the road where the upgrade is required as a consequence of the subdivision. 24 – 2