2. General Rules Volume Two Temporary Military Training Activity Other General Rules contained in Chapter 2 may apply in addition to any relevant zone rules. 2.41. Permitted Activities Unless expressly limited elsewhere by rule a in the Marlborough Environment Plan (the Plan), the following activities shall be permitted without resource consent where they comply with the applicable standards in 2.42: [D] 2.41.1. Temporary military training activity. 2.42. Standards that apply to specific permitted activities 2.42.1. Temporary military training activity. 2.42.1.1. The activity must be limited to a period not exceeding 31 days. 2.42.1.2. Permanent structures must not be constructed. 2.42.1.3. Noise levels of a short duration generated as part of a temporary military training activity must not exceed the following: (a) Noise levels measured from a line 20m from, and parallel to, the nominal boundary of any dwelling or the legal boundary where this is closer to the dwelling must not exceed the following limits: Time Limits (DBA) Any Day L L95 L MAX 10 6:30 am - 7:30 am 60 45 70 7:30 am – 6.00 pm 75 60 90 6.00 pm – 8.00 pm 70 55 85 8.00 pm - 6:30 am 55 2.42.1.4. Impulse noise resulting from the use of explosives, explosives simulators small arms must not exceed 122dBC. 2 – 64