Wairau/Awatere Resource Management Plan 2. Prior to the issue by the Council of a Building Consent for any dwelling or any addition or alteration to a dwelling, an acoustic certificate shall be provided to the Council by a suitably qualified and experienced acoustic engineer to demonstrate that the building design will reduce aircraft noise to acceptable levels within habitable spaces. App M - 2