Identify and liaise with other support group resources for the achievement of these objectives. From time to time contribute and operate specific programmes to assist particular groups in the rural community on such terms and conditions as are consistent with the charitable objectives of the Trust. Recovery Planning Committee This Team performs a governance role ensuring that processes and plans are in place to guide recovery operations during an emergency. When an emergency occurs a Recovery Team can be established by the Recovery Manager to coordinate the recovery processes. Business as usual membership includes: Recovery Manager Lifelines Coordinator Ministry of Social Development Group Welfare Manager Group Manager Top of the South Rural Support Trust A representative from MCDEM During an emergency the following agencies and roles may be involved in the recovery: Building Control Office Medical Officer of Health Insurance Industry Rep. Marlborough Lines and/or Transpower Structural Engineer MDC Assets and Services Manager MDC Environmental Health Office Ministry of Business, Innovation and Employment Marlborough Chamber of Commerce Nelson/Marlborough Health And other co-opted members as appropriate such as Federated Farmers, Wine Growers, Marine Farmers, etc. 5.2.3 CDEM Plans and Procedures The Ministry carried out a Capability Assessment of the Marlborough CDEM Group in 2014. In its report the Ministry identified Marlborough as a Group which had lifted its performance from a ‘developing’ score of 62.2/100 to a ‘mature’ score of 80.2/100. There were areas identified within which the Group could still raise its performance and these have been included in a Corrective Action Plan. The deliverables identified in the CAP are to be delivered by June 2017. The workplan for the Marlborough CDEM Group is developed on the basis of this Plan and from that develops a three year Work Plan which is revised annually and approved by the CEG. All CDEM committees have input into the process. Other plans include a draft Tsunami Contingency Plan, and the Fuel Storage in Marlborough Plan (currently under development). Plans need to be regularly reviewed and in some cases rewritten, to reflect situation, scientific and legislative changes. . Because of the small size of the Group use is often made of plans developed by members such as the Marlborough Kaikoura Rural Fire District Plan, Police’s Maritime Mass Rescue Plan, Council’s Rivers and Drainage Flood Response Manual and the Top of the South Rural Support Trust’s Response and Recovery Plan. 5.2.4 CDEM Warning Systems MCDEM is responsible for issuing National warnings to CDEM Groups and other key response agencies for emergencies of national significance. The Marlborough CDEM Group is required to be capable of receiving, acknowledging and responding to National warning messages at all times within 30 minutes and have procedures in place to facilitate an effective response. The National System is tested by MCDEM quarterly. Marlborough Civil Defence Emergency Management Plan, 2017-2022 Page 39