Record No. 14111194 WITHOUT CONTROLS WITH EXISTING CONTROLS TREATMENT The risk: describe what can happen and how it can happen Op Maintenance - Water To be revised once WSP in place for all supplies - 2014 Ref: 13125554 - Blenheim Supply Bulk to be superseded by Water Safety Plans - residual will become operational risks appended to the WSPs. Security/Storage Risk?? To be revised once PHRMP in place for all Category Risk Area supplies - 2014 Ref: 13125554 - Blenheim Distribution Man Made Third Party All Record Accept current Hazard Damage drawings level of control. provided to utility providers, developers and other excavation 3 A E contractors. 2 C M Y COP for Access to Transport Corridors. Alternative supply/storage in network. Page 138 5 – 1secneuqesnoC doohilekiL E - A ksiR fo leveL gnitsixe eht era tahW slortnoc5 – 1 secneuqesnoCdoohilekiLE-AksiRfoleveLslortnoc gnitsixe eht erA etauqedastnemmoC nalP noitcA