3.5 Asset Programmes to Meet Demand The main outline capital works programme is shown in Appendix 4 – Outline Capital Budget 2015- . The projects that have a significant element of growth as a driver have been abstracted from the main programme and are shown in Table 6 Growth driven capital works Area Project Budgeted Year Budget Cost Havelock Universal metering 2017/18 $231,000 Picton Universal metering 2019-20 $2,340,000 Renwick Universal metering 2017/18 $658,000 Picton Pressure Management 2016/17 $392,000 Blenheim Taylor High Reservoir 2014-16 $2,740,000 Havelock Pipe: Bores - Mahakipawa Road 2016-17 $230,000 Blenheim Water Mains Upgrades 2016/17,18/19,20/21,22/23 $2,173,000 Renwick Additional Retic. Pump 2018/19 $90,000 Havelock Second Reservoir 2018/19 $350,000 Table 6 Growth driven capital works 2014-19 Page 51