Volume Three Appendix 14 ID No. Map No. Site Description Legal Description Designation Map 172 Mobile Station Radio Communications and South West Blenheim / Ancillary Purposes Wither Ward Exchange Sec 5 Blk IX Town of Telecommunications and J16 59, 219 Seddon Street, Ward Ward Radio Communications and Ancillary Purposes Ward Microwave Station Telecommunications and J17 219 South East of Ward Section 1 So 6530 Radio Communications and Ancillary Purposes Weld Cone Microwave / Telecommunications and J18 219 Land Mobile Station Sec 2 SO 6530 Radio Communications and Weld Cone, South West Ancillary Purposes of Ward Township Conditions: Blenheim Exchange Blenheim Microwave Station Height – Masts and antennas 1. That the height of any mast or tower and associated antennas (excluding any lightening rod) on the Blenheim Exchange site shall not exceed 20m, and on the Blenheim Microwave Station site shall not exceed 25m. 2. Antennas mounted on the roof of buildings shall not extend more than 5m above the maximum height of the roof of any existing building. Noise 3. Any new noise generating equipment (excluding any engine alternator required for emergency backup power generation) shall not exceed the following noise limits: At the boundary of any other site zoned Central Business or Industrial 7.00 am – 10.00 pm on any day: Leq 65dBA 10.00 pm – 7.00 am on any day: Leq 60dBA. 4. Where existing site noise already exceeds the levels in condition 4 above, that any new noise generating equipment (excluding any engine alternator required for emergency backup power generation and/or load shedding) shall cumulatively in combination with any other noise generating equipment on the site not result in any increase in existing noise levels received at any other property boundary. A noise assessment may need to be submitted as part of any outline plan (depending on circumstances such as the nature of the noise generating equipment, remoteness of the site, and proximity to boundaries) to confirm the existing noise levels and predicted new noise levels to confirm compliance with this condition. 5. For any new engine alternator required for emergency backup power generation and/or load shedding that exceeds the noise limits is Condition 4 above, that an outline plan shall be required that demonstrates how the equipment and any mitigation is the best practicable option (BPO) to ensure that noise levels do not exceed a reasonable level. App 14 – 19