Infrastructure Strategy Project Project Title Title WTP Riverlands 2020/21 7.3 0 100 0 Picton 2017 1.2 20 80 0 Treatment Speeds Rd Awatere 2021/22 0.6 20 80 0 Res Reservoir Seddon 2018 4.5 10 90 0 Picton 2028/29 3.1 0 10 90 Treatment Essons/Bar Blenheim 2018 1.9 0 100 0 nes Raw Wither Res. Blenheim 2027/28 1.2 10 79 11 Upgrade Wither Picton 2018 1.1 0 0 100 Booster Speeds Rd Blenheim Up to 4.6 42 24 34 Trunk Main Reticulation 2031 Renwick 2019 2.5 20 60 20 Awatere Up to 1.1 34 6 60 Reservoir Pipelines 2034 Renwick 2019/20 0.5 30 70 0 Blenheim 2029/30 7.4 30 70 0 Universal Universal Metering Metering Havelock 2018/19 0.2 20 80 0 Havelock 2028/29 7.8 40 40 20 Universal New Metering Source & Havelock 2020/21 0.9 23 77 0 Treatment Reservoir Picton 2022/23 4.2 0 0 100 Renwick 2019 0.4 20 60 20 Speeds Rd Wells/ Trunk Main Pumps *Costs exclude overheads, financing and inflation Renwick 2018/19 1.6 20 75 5 Pipelines Awatere 2020/21 1.5 10 90 0 Treatment POE Havelock 2020 4.9 15 85 0 Treatment Picton 2021/22 2.4 29 71 0 Universal Metering Renwick 2019 6.0 20 80 0 Treatment 2018-2028 Long Term Plan Page 193 etamixorppAderiuqeRetaD detamitsE tsoC m$revirD tcejorP)gnithgiew %( htworGrevirDtcejorP)gnithgiew%(fo leveL ecivreSrevirDtcejorP)gnithgiew %( laweneRetamixorppAderiuqeR etaDdetamitsEtsoCm$revirDtcejorP)gnithgiew%(htworGrevirDtcejorP)gnithgiew%(foleveLecivreSrevirDtcejorP)gnithgiew %( laweneR