Activity Group: Community Facilities Levels of Service 2018-28: Community Facilities Performance Targets (for the financial year) Level of Service Indicator Baseline 2018-19 2019-20 2020-21 2021-28 Community facilities are accessible and Resident satisfaction with this service ≥7.8 ≥7.8 ≥7.8 ≥7.8 ≥7.8 maintained to a high standard appropriate to the as measured by survey, where 10 = range and level of use, including: “service delivered extremely well”. • reserves, parks, gardens, civic and open spaces • cycling and walking tracks and paths • cemeteries and war memorials • swimming pools • sports parks • public toilets. Neighbourhood parks in urban area within The proportion of residentially zoned ≥98% ≥98% ≥98% ≥98% ≥98% walking distance of home, providing play houses in urban areas within 500m opportunities for all ages, open space and walking distance of neighbourhood amenity values. parks. Use and development of reserves is carried out Reserve management plans are in New measure Review Victoria Review of Complete new Review existing in accordance with Reserve Management Plans place for Council reserves and Domain RMP Wither Hills sports parks urban RMPs (RMPs) reviewed or prepared as necessary. Farm Park and and new Picton neighbourhood Foreshore parks RMP’s RMP’s A connected network of walking and cycling An enhanced and/or extended walking New measure Enhancements Enhancements Enhancements Enhancements paths and tracks that is accessible and visible and cycling paths and tracks network. made to existing made to existing made to existing made to existing and caters for a range of abilities. network and/or network and/or network and/or network and/or new additions to new additions to new additions to new additions to network network network network Street trees provide an attractive streetscape Appropriately planted street trees on New measure 100% 100% 100% 100% and are well maintained. new urban roads and renewal of street trees on existing roads. Number of street trees planted per New measure 100 100 120 120 year. Condition assessment of each street New measure 100% 100% 100% 100% tree undertaken once every two years (or sooner if necessary). Playgrounds are varied and stimulating and are New playgrounds and renewals have New measure 75% 85% 95% 100% incorporated shade (including natural 2018-2028 Long Term Plan Page 63