Infrastructure Strategy Project Title Main Pump Station 2021/23 8.0 30% 70% 0% (MOPS) Improved resilience to natural hazards Havelock Treatment 2018/23 7.98 10% 90% 0% Improved effluent 2029/31 6.0 15% 85% 0% quality to meet environmental & cultural standards for discharge Renwick Pump Station 2027 1.2 100% 0% 0% Increased capacity to meet urban growth projection Seddon Sewage 2018/23 3.8 10% 90% Stormwater Treatment Improved effluent For Marlborough to achieve its vision for the future the infrastructure must be sufficient quality to meet and functioning; achievable and sustainable with the resources available environmental/cultural standards Stormwater Goals St Andrews 2020/21 1.0 0% 100% 0% The habitable floors of all properties within urban stormwater areas will not experience Reticulation flooding from storms that, on average, will occur once in 50 years or less Extend sewerage All properties within urban stormwater areas will not experience from flood water from services to peripheral storms that, on average, will occur once in 10 years or less. community The graphs below shows the expenditure and drivers of wastewater capital projects Discharges of urban stormwater will not cause a deterioration in the quality of the receiving water beyond the standards of the time. 2018-2028 Long Term Plan Page 200 etamixorppAderiuqeRetaD detamitsE tsoC m$revirDtcejorP)gnithgiew%( htworGrevirD tcejorP)gnithgiew %(fo leveL ecivreSrevirDtcejorP)gnithgiew %( laweneR