Activity Group: Flood Protection and Control Works Levels of Service 2018-28: Flood Protection and Control Works Performance Targets (for the financial year) Level of Service Indicator Baseline 2018-19 2019-20 2020-21 2021-28 Provide an overall level of service Resident satisfaction with this service as measured by survey, where 7.0 7.0 7.0 7.0 7.0 that meets or exceeds residents’ 10 = “service delivered extremely well”. expectations. Wairau River scheme - system % of floodway and tributary network inspected annually for condition 95% 95% 95% 95% 95% and adequacy and maintenance requirements. These major flood protection and % of programmed maintenance and renewal works identified in the 100% 100% 100% 100% 100% control works are maintained, AMP ‘practically’2 completed. repaired and renewed to the standards defined in the Rivers and % of capital improvement works in the AMP achieved. 80% 80% 80% 80% 80% Land Drainage Asset Management Timeliness of providing a report to the Assets & Services Committee <2 months Plan (AMP) on the damage to the floodway network and potential problem areas <2 months <2 months <2 months <2 months post following significant flood events (generally exceeding a 1:2 year post event post event post event post event event return event). Wairau Plains % of drain network inspected at least annually for condition and Effective drainage provided to the maintenance requirements. 100% 100% 100% 100% 100% lower Wairau plains. % of drains weed sprayed each year. 90% 90% 90% 90% 90% % of drains mechanically cleared each year. 4% 4% 4% 4% 4% Picton Floodways % of floodway network inspected annually for condition and 100% 100% 100% 100% 100% Monitor, maintain and upgrade key maintenance requirements. Picton floodways (Waitohi and % of programmed maintenance and renewal works identified in the 100% 100% 100% 100% 100% Waikawa Rivers) to provide for a 1 AMP ‘practically’ completed. in 50 yearreturn period flood event. Blenheim Urban % of programmed maintenance and renewal works identified in the 100% 100% 100% 100% 100% Upgrade and maintain key Blenheim AMP ‘practically’ completed. stormwater outfalls 3. % of capital improvement works in the AMP achieved. 80% 80% 80% 80% 80% Sound flood hazard advice provided. Number of liability consequences for Council arising from incorrect <5 <5 <5 <5 <5 advice provided on flood hazards as part of the resource consent, building consent, PIMs and LIMs processes. 2NZS 3910:2003 defines practical completion as when the contract works or any separable portion are complete except for minor omissions and minor defects. 3Channels and pump stations, including the Town Branch and Caseys, Fulton and Murphys Creeks to provide for 1 in 50 year return period storm event runoff including both infill and greenfield development. 2018-2028 Long Term Plan Page 77