Marlborough Sounds Resource Management Plan 33.2.3.1 Standards 33.2.3.1.1 The disturbance does not exceed : a) 50,000 cubic metres in volume; b) 4 hectares in area; or c) 1000 metres in length in any 12 month period. 33.2.3.1.2 The activity shall be undertaken in a manner which minimises water turbidity. 33.2.3.2 Terms 33.2.3.2.1 A coastal permit in respect of the activity may be granted for a period not exceeding five years. 33.2.3.2.2 The consent holder shall pay to the Council, on behalf of the Crown, any sum of money required to be paid by regulation made under section 360(1)(c) of the Act. 33.2.3.3 Matters Over Which Control is Reserved 33.2.3.3.1 The matters over which the Council shall exercise its control are: a) The duration of the consent; b) The information and monitoring requirements; c) The administrative charges payable; d) The method of dredging; e) The depth of dredging; f) The frequency and timing of dredging; g) The volume of material removed; and h) Disposal of tailings. 33.2.4 Point Source Stormwater Discharge The discharge of point source stormwater into the coastal marine area or the discharge of point source stormwater into or onto land in coastal marine zone in circumstances which may result in that stormwater entering the coastal marine zone is a Controlled Activity provided that: 33.2.4.1 Standards 33.2.4.1.1 The contaminant or water discharged (either by itself or when combined with the same, similar, or other contaminants or water) will not give rise to all or any of the following effects: a) The production of any conspicuous oil or grease films, scums or foams, or floatable or suspended materials; b) Any conspicuous change in colour or visual clarity; c) Any emission of objectionable odour; d) Any significant effects on aquatic life; e) Any significant reduction in water quality; f) Be detrimental to the health, safety or welfare of persons using the water; 33 - 16