Marlborough Sounds Resource Management Plan 28.1.13.1.2 The developer shall make all arrangements, as required by the Plan, with the appropriate authorities for the supply and installation of electric power, road light reticulation, and telecommunication services. 28.1.13.1.3 Provision shall be made for ducts or conduits to be installed under roads and private roads and private access if the authorities are unable to install their cables/ pipes at the appropriate time. 28.1.13.2 Reticulated Services to be Underground 28.1.13.2.1 All services in urban areas are to be underground unless otherwise authorised by the Council. 28.1.13.2.2 Where the removal of existing poles or underground cables is necessary for the construction of new roads or services, the cost of such removal and reinstatement shall be borne by the developer. 28.1.13.2.3 In submitting any subdivision plan for approval, the developer shall provide evidence that the general layout will enable reticulation by all utility service authorities. 28.1.13.2.4 Adequate provision shall be made for such services as transformer sites, junction boxes and other special needs of all authorities. Road lighting shall comply with the requirements of AS/ NZS 1158, 1997 Road Lighting and the developer’s agent will be required to confirm in writing that these lighting standards will be met. 28.1.13.3 Standard of Workmanship Required 28.1.13.3.1 Council’s Code of Practice for Subdivision and Land Development or authorised alternatives shall be used for all facets of workmanship. Alternative materials, construction procedures or production methods outside the scope of the Code of Practice for Subdivision and Land Development may be approved by the Council. 28.1.13.3.2 The developer shall be responsible to ensure that work is carried out in accordance with the complying documents and sound civil engineering practice. 28.1.13.4 Approval Required Before Commencement of Work Work shall not commence on the engineering construction of any subdivision unless: 28.1.13.4.1 The Council has granted a subdivision consent, and, if required; 28.1.13.4.2 The developer has lodged a design certificate stating that the works have been designed in accordance with the Council’s Code of Practice for Subdivision and Land Development along with the engineering drawings, specifications and calculations for the specific work that is required. 28.1.13.5 Engineering Drawings The following documents and plans, shall be submitted: 28.1.13.5.1 Earthworks Engineering drawings detailing the following earthworks proposals: 28 - 8