25 July 2014 Chapter 38 - Conservation Zone 38.1.8.3 No land disturbance may damage or adversely affect any historical, cultural or registered archaeological artefact or site unless an authority to do so has been granted by the New Zealand Historic Places Trust. 38.1.9 Hazards/Riparian Management 38.1.9.1 No building activity shall take place as a Permitted Activity within or having any adverse effect on or being affected by any natural hazard area identified on the Planning Maps. 38.1.9.2 Unless specified in the schedule of water bodies and Table 1 in Appendix I and the Ecology Maps in Volume Three, or to the contrary elsewhere in the Plan, all proposed buildings and structures shall be set back at least 8 metres from the top of any bank of any river, or where there is a stopbank at least 8 metres from the landward toe of that stopbank, except that this shall not apply to road structures across rivers. Buildings and structures shall be set back at least 20 metres from the coast, lakes and wetlands. 38.2 Controlled Activities Application must be made for a resource consent for a Controlled Activity with respect to the following: • Cultivation of riparian management zones on slopes of 0-20° as specified in Appendix I and the Ecology maps in Volume Three. 38.2.1 Cultivation of riparian management zones on slopes of 0-20° as specified in Appendix I and the Ecology Maps in Volume Three. 38.2.1.1 Matters Over Which Control is Reserved: a) The effects on the natural clarity of any river, lake, wetland or the sea; b) The effects of the entry of any woody material into any river, lake, wetland or the sea; c) The effects on natural hazard management, including stability of riparian management zones and river control matters; d) Protection of riparian habitat diversity; e) Protection of instream habitat; f) Provision of physical public access where legal public access is provided for. 38 -9