Marlborough Sounds Resource Management Plan 20 August 2015 34.2.3 Maintenance Dredging Disturbance and damage of foreshore and seabed associated with dredging of the marina and its entrance areas including any associated discharge of water or contaminants, is a Controlled Activity provided that the activity conforms to the following standards and terms: 34.2.3.1 Standards 34.2.3.1.1 The disturbance does not exceed: • 50,000 cubic metres in volume; • 4 hectares in area; or • 1000 metres in length in any 12 month period. 34.2.3.1.2 The activity shall be undertaken in a manner which minimises water turbidity. 34.2.3.2 Terms 34.2.3.2.1 A coastal permit in respect of the activity may be granted for a period not exceeding five years. 34.2.3.2.2 The consent holder shall pay to the Council, on behalf of the Crown, any sum of money required to be paid by regulation made under section 360(1)(c) of the Act. 34.2.3.3 Matters Over Which Control is Reserved 34.2.3.3.1 The matters over which the Council shall exercise its control are: a) The duration of the consent; b) The information and monitoring requirements; c) The administrative charges payable; d) The method of dredging; e) The depth of dredging; f) The frequency and timing of dredging; g) The volume of material removed; and h) Disposal of tailings. 34.3 Limited Discretionary Activities • Minor Non Compliance; • Activities within Riparian Management Zones (specified in Apprndix I and Volume Three Maps); and • Other Limited Discretionary Activities (Rule 34.3.5). • Placement and use (including occupation) of swing moorings in Appendix J, Schedule 4.1. 34.3.1 Minor Non Compliance Minor non-compliance with the conditions for Permitted Activities may be permitted to the extent specified and will be considered by way of a Limited Discretionary Consent. 34 - 14