Marlborough Sounds Resource Management Plan 28.1.8.1 Engineering drawings, specifications and where required, calculations covering the following sections of the work to be carried out: a) Site regrading; b) Roading and access; c) Drainage (stormwater and sanitary); d) Water supply and other services; and e) Geotechnical Engineer’s report on the suitability of the land for subdivision. 28.1.8.2 ‘As-Built’ plans, to a minimum scale of 1:500. 28.1.8.3 A certificate stating that the works have been carried out under the control of and to the satisfaction of the certifying professional. 28.1.9 Numbers of Copies of Documents Required Unless otherwise specified, the number of copies of documents required to be submitted to Council shall be as follows: Subdivision Plan .................................................. 3 Engineering drawings/ specifications .......................... 2 ‘As-Built’ plans .................................................. 1 Survey Plans .................................................. 3 28.1.10 Requirements of Authorities other than Council Without limiting the requirements of the Act, the following organisations or persons may have an interest greater than the general public in any proposed subdivision or development: • Electricity Network Operators; • Telecommunications Network Operators; • Transit New Zealand; • The Department of Conservation; • Iwi; • New Zealand Historic Places Trust; • Tranz Rail Ltd; • Aviation Authorities; and • Nelson Marlborough Fish and Game Council. Where appropriate the developer shall consult with those organisations and persons. 28.1.11 Developer’s Agent The developer may appoint a representative or representatives to undertake the responsibilities of: 28.1.11.1 Design of the subdivision including preparation of plans and documents; 28 - 6