20 August 2015 Chapter 35 - Coastal Marine Zones One, Two and Three l) Where applicable the permit holder shall pay to the Council, on behalf of the Crown, any sum of money required to be paid by regulations made under section 360(1)(c) of the Act; and m) Written notice to the Hydrographer of the Royal New Zealand Navy of the structure or work at the time the structure of work is completed. 35.5 Non-Complying Activities • Any activity other than a Prohibited Activity which is neither a Permitted, Controlled, or Discretionary Activity shall be deemed to be a Non-Complying Activity; • Deliberate introduction of exotic or introduced plants into the coastal marine area; • Depositing material on the foreshore or seabed; • Discharges to the coastal marine area; • Marine farms within Coastal Marine Zone Two other than marine farms specified as Controlled Activities in Rule 35.2.5 or Limited Discretionary Activities in Rule 35.3.1 or Discretionary Activities pursuant to Rule 35.4: a) inside a line drawn 50 metres from mean low water mark at right angles to a line normal to the nearest part of mean high water mark; or b) beyond a line drawn 200 metres from mean low water, at right angles to a line normal to the nearest part of mean high water mark (refer Figure 35.1: Measurement of Marine Farm from Shore). • Marinas within Waikawa Bay which are located outside the Marina Zone. • Residential Activity; • Structures in the coastal marine area more or less parallel to mean high water springs; • Structures in the coastal marine area oblique or perpendicular to mean high water springs; • Structures in the coastal marine area used in the petroleum and chemical industry; • Structures which impound or effectively contain the coastal marine area; and • Subdivision. • Marine farms within Coastal Marine Zone 3 other than marine farming provided for under Rule 35.4.2.10.1. 35.5.1 Structures 35.5.1.1 Structures Which Impound or Effectively Contain the Coastal Marine Area Any activity involving the erection of a structure or structures which will impound or effectively contain 8 hectares or more of the coastal marine area is a Non Complying Activity. 35.5.1.2 Structures More or Less Parallel to Mean High Water Springs Any activity involving the erection of a structure or structures: 35 - 31